Gaeilge

Search gov.ie

Collection

Section 50: Reference Information and Technical Guidance Material for Applicants

Flood Estimation FSR Cunnane-Lynn - 1975
View the file View

Paper first presented to the Institution of Engineers Of Ireland.

Culvert Hydraulics and Section 50 Consent, OPW 2001
View the file View

Paper presented at National Hydrology Conference, 2001.

Methods of Flood Estimation: A Guide to the Flood Studies Report
View the file View

JV Sutcliffe, Institute of Hydrology, 1978.

Climate Change Factors for Use in the Design of New Structures
View the file View

A risk based approach on the likely impacts of climate change must be used in estimating design flood flows for bridge and culvert design.

The Flood Studies Made Simple, Carroll,1981 (Extract)‌
View the file View

Example of the catchment characteristics equation.

Planning guidance has been prepared by the Department of the Environment, Community and Local Government and the OPW on flood risk management in the planning process. The OPW will not consent to a bridge or culvert over an existing watercourse, where the requirements under the planning guidelines have not been met.

Planning System and Flood Risk Management Guidelines
View the file View
Planning and Development - Technical Guidance
View the file View