Boatyard work bay upgrade in up to two bays of circa 500 sq.m each. Excavate, dispose off site at licenced facility of existing life expired asphalt surfacing, installation of drainage pipework, gullies and manholes ( depth not greater than 2m) shuttering and placing of RC concrete slab to line and levels with box out around existing rails, grout and concrete around rails. each lot to be constructed in two phases to allow DAFM replacement of life expired rails. Tender award is expected in late may early June 2022 and works expected to commence in June or July 2022 and is awarded subject to available funding.