- All documentation relating to the decision to grant permission to undertake a campaign of annual inspection and maintenance surveys of the Corrib Field pipeline and subsea facilities from the landfall valve site at Glengad, Co. Mayo to the Corrib Field for the five year period commencing 1 January 2024 and ending 1 January 2029 are available below.
Corrib Inspection 2024 - Approval of Vessels 16 May 2024
Corrib Inspection Survey 2023 - Letter of Consent 16 May 2024
Final Submission VEPIL Corrib multi-year offshore surveys
Tab A1 Corrib Multi-year Application Letter - Offshore Surveys
Tab A2 Corrib Application Survey 1 September 2023
Tab A3 02 EIA Screening and Environmental Risk Assessment Corrib
Tab A4 01 NIS Corrib Pipeline Inspection and Maintenance Surveys 1 September 2023
Tab B1 EIA Screening Determination Vermillion 2023
Tab B2 Appendix 1 Ramboll Report
Tab C1 AA Screening Determination Vermillion 2023
Tab C2 Appendix 1 - Ramboll Report
Tab D1 Corrib Field AA Determination
Tab D2 Appendix 1 - Ramboll Report
Tab E Corrib Offshore Works 2024 Technical Observations 19 March 2024
Tab F Observations Prescribed Bodies Combined - Redacted
Tab G1 EIA Screening Newspaper Advert - Redacted
Tab G2 AA Screening Newspaper Advert - Redacted
Tab G3 AA Corrib Field Irish Independent Newspaper Advert 2 March - Redacted