Cuardaigh ar fad gov.ie

Foilsiú

FOI Request 18/006

Category: Journalist

Reference: FOI Request 18/006

Request:

The total amount spent by the Dept. of Foreign Affairs on capital/refurbishment works on the country's network of embassies in 2017.

A breakdown in the costs of the refurbishment works at the top eight embassies where the capital/refurbishment costs were highest in 2017.

Date: January 4, 2018

Replied: February 2, 2018

Reply 18/006
Amharc amharc
Schedule 18/006
Amharc amharc

Is ann don fhoirm seo d’aiseolas, agus sin amháin, a bhaineann leis an leathanach reatha.

Ná cuir faisnéis phearsanta ná airgeadais san áireamh.

Chun gov.ie a fheabhsú, déanfar anailís ar an bhfaisnéis a chuireann tú isteach agus ní thabharfar freagra uirthi ar bhonn indibhidiúil.

Conas mar a bhí d’eispéireas ar an leathanach reatha? (ag teastáil)

Tá 400 carachtar fágtha agat