The action plan provides for the building of a Dublin Airport Authority owned new Terminal (Terminal Two) at Dublin Airport to be open in 2009.
May 2007 Independent Verification Report on Proposed Terminal Two for Dublin Airport
The verification team was appointed by the Department of Transport in March 2006 to verify the specification and cost of Terminal Two.