ASA – associated guidance documents (school building and design)



Type 1 attachment (including interim accommodation)

Type 1 schools: standardised reports
Please note that the procedures set out herein relate to pre-Stage 1 and Stage 1/2A Reports only
Download link for Íoslódáil
Design submission pre-stage report 1
The purpose of this pre-stage 1 report is to confirm viability of the project brief
Download link for Íoslódáil
Design submission combined stage 1/2A report
This report template sets out the requirements for the Stage 1/2A Report at completion of the Developed Design Stage on an Additional School Accommodation (ASA) Building Project
Download link for Íoslódáil
Form of Acceptance 2023 R1
This form must be completed and returned to ASAProjects@education.gov.ie before entering into any formal agreement if funding is being sought from the Department
Download link for Íoslódáil
S.I. No. 114 of 2021 (Statutory Instrument)
Planning and Development Act 2000 (Exempted Development) Regulations 2021
Amharc amharc

Type 1 letter attachments over 210m2

Design submission pre-stage report 1
The purpose of this pre-stage 1 report is to confirm viability of the project brief
Download link for Íoslódáil
Design submission combined stage 1/2A report
This report template sets out the requirements for the Stage 1/2A Report at completion of the Developed Design Stage on an Additional School Accommodation (ASA) Building Project
Download link for Íoslódáil
Type 1 schools: standardised reports
Please note that the procedures set out herein relate to pre-Stage 1 and Stage 1/2A Reports only
Download link for Íoslódáil

Type 1 letter attachments under 210m2

Design submission pre-stage report 1
The purpose of this pre-stage 1 report is to confirm viability of the project brief
Download link for Íoslódáil
Design submission combined stage 1/2A report
This report template sets out the requirements for the Stage 1/2A Report at completion of the Developed Design Stage on an Additional School Accommodation (ASA) Building Project
Download link for Íoslódáil
Type 1 schools: standardised reports
Please note that the procedures set out herein relate to pre-Stage 1 and Stage 1/2A Reports only
Download link for Íoslódáil
S.I. No. 114 of 2021 (Statutory Instrument)
Planning and Development Act 2000 (Exempted Development) Regulations 2021
Amharc amharc

Type 2 and Type B letters (including interim accommodation)

Asbestos management obligations for school authorities (appendix 2)
A school authority has responsibilities under the Safety Health and Welfare at Work Act 2005 and the Safety Health and Welfare at Work (Construction) Regulations 2013
Download link for Íoslódáil
Drawdown criteria: devolved projects (appendix 3)
To cover the payment of fees due to your Design Team at Stage 1 and Stage 2b, the Department will issue a payment to cover these costs at the end of Stage 1, when requested by the Board of Management
Download link for Íoslódáil
Form of Acceptance 2022 R1
This form must be completed and returned to ASAProjects@education.gov.ie before entering into any formal agreement if funding is being sought from the Department
Download link for Íoslódáil

Type 2a, 2b and 3 letter attachments

Asbestos management obligations for school authorities (appendix 2)
A school authority has responsibilities under the Safety Health and Welfare at Work Act 2005 and the Safety Health and Welfare at Work (Construction) Regulations 2013
Download link for Íoslódáil
Drawdown criteria: devolved projects (appendix 3)
To cover the payment of fees due to your Design Team at Stage 1 and Stage 2b, the Department will issue a payment to cover these costs at the end of Stage 1, when requested by the Board of Management
Download link for Íoslódáil