Part IIV No. 64 – Amenity Trackway, Edera Bog (mid Shannon Wilderness Park)
- Foilsithe: 6 Meitheamh 2019
- oscailte le haghaidh aighneachtaí ó: 7 Meitheamh 2019
- Dúnadh na haighneachtaí: 5 Iúil 2019
- An t-eolas is déanaí: 6 Meitheamh 2019
Consultation is closed
Summary
The construction of a trackway approximately 4.65km in length through the townlands of Derrycolumb, Derrymacar, Edera, Gorteenclareen and Derrynabuntale at Edera Bog. The works will consist of a walkway, a number of activity areas at various locations and associated site works.
Comhairliúchán seachtrach
To view the consultation click the button below.