Part VIII No 80 - Construction of Granard Urban Greenway
- Foilsithe: 25 Meán Fómhair 2020
- oscailte le haghaidh aighneachtaí ó: 25 Meán Fómhair 2020
- Dúnadh na haighneachtaí: 23 Deireadh Fómhair 2020
- An t-eolas is déanaí: 11 Aibreán 2025
Consultation is closed
Construction of c2.1km long, approx. 3m wide greenway path, bridge and fencing including loop through the forestry to accommodate both pedestrians and cyclists, from GAA complex to R194 Regional Road through the townlands of Rathcronan and Higginstown.
Comhairliúchán seachtrach
To view the consultation click the button below.