Comhairliúchán
Part 8: Proposed Grand Canal Greenway Phase 2 Additional Bridges P82024.07
- Foilsithe: 14 Lúnasa 2024
- oscailte le haghaidh aighneachtaí ó: 14 Lúnasa 2024
- Dúnadh na haighneachtaí: 25 Meán Fómhair 2024
- An t-eolas is déanaí: 12 Aibreán 2025
Consultation is closed
The proposal is for the provision of 2 no. additional bridges on Phase 2 of the Grand Canal Greenway. Bridge 1 is located in Lowtown, and Bridge 2 is located just east of the existing Healy’s Bridge (Bonynge Bridge).
Comhairliúchán seachtrach
To view the consultation click the button below.