Ballyvourney and Ballymakeera Flood Relief Scheme Interim Works

  • Ó: Comhairle Chontae Chorcaí

  • Foilsithe: 16 Eanáir 2020
  • oscailte le haghaidh aighneachtaí ó: 6 Nollaig 2019
  • Dúnadh na haighneachtaí: 10 Eanáir 2020
  • An t-eolas is déanaí: 11 Aibreán 2025

Consultation is closed


Summary

The proposed development comprises the following infrastructure projects or elements:

• Interim hard defences are anticipated to consist of 1000kg (10KN) sand bags and impermeable liners.

• Land raising at field access points at three locations, to allow access to/from the existing gateways whilst also mitigating against the 20-year flood levels.

• The fitting of two non-return valves at the outlets of two pipe outfalls. Also, a sump would likely need to be constructed on the dry side of each piped outlet and a pump to be available in times of need.

Submissions and observations with respect to the proposed development may be made on or before 24 January 2020 as follows:

Online on Cork County Council’s website at https://www.yourcouncil.ie or

In writing and clearly marked ‘Ballyvourney and Ballymakeera Flood Relief Scheme Interim Works’ to Senior Engineer, Coastal Management and Flood Projects, Cork County Council, County Hall, Carrigrohane Road, Cork, T12 R2NC