Comhairliúchán
Part 8 Ballintubber Flood Relief Scheme
- Foilsithe: 9 Aibreán 2021
- oscailte le haghaidh aighneachtaí ó: 9 Aibreán 2021
- Dúnadh na haighneachtaí: 28 Bealtaine 2021
- An t-eolas is déanaí: 11 Aibreán 2025
Consultation is closed
Ballintubber Flood Relief Scheme
Construction of 1.1km of concrete surface water pipes, 22 manholes, and 10 gullies to collect surface water run-off from low lying areas in Ballintubber.
Comhairliúchán seachtrach
To view the consultation click the button below.