Part 8 - Carrigtwohill to Midleton Inter-urban Cycle Route Phase 2
- Foilsithe: 18 Eanáir 2024
- oscailte le haghaidh aighneachtaí ó: 18 Eanáir 2024
- Dúnadh na haighneachtaí: 29 Feabhra 2024
- An t-eolas is déanaí: 12 Aibreán 2025
Consultation is closed
The proposed development involves the construction of a dedicated pedestrian and cycle route from lands west of Ballyadam Road (L7640-0), Carrigtwohill to lands east of Castle Rock Avenue, (L3618-0), Water-Rock, Midleton. The dedicated pedestrian and cycle corridor will connect the Carrigtwohill and Water Rock Urban Expansion Areas and to the Carrigtwohill to Midleton Inter-urban Cycle Route Phase 1. The proposed development includes the following:
- a general cross section of 4m wide shared pedestrian and cycle path with public lightingand landscaping on both sides
- 1 no. underpass below an existing bridge embankment north of the Cork to Midleton railway line
- 1 no. toucan crossing at Carrigane Road ((L3617-25)
- raised pedestrian/cycle crossings at Ballyadam Road (L7640-0) and Castle Rock Road (L3618-0)
- traffic calming measures on existing roads Ballyadam Road (L7640-0) and Carrigane Road (L3617-25)
Comhairliúchán seachtrach
To view the consultation click the button below.