Part 8 Carrigtwohill to Midleton Inter-Urban Cycleway Phase 1
- Foilsithe: 2 Nollaig 2021
- oscailte le haghaidh aighneachtaí ó: 26 Samhain 2021
- Dúnadh na haighneachtaí: 21 Eanáir 2022
- An t-eolas is déanaí: 12 Aibreán 2025
Consultation is closed
The proposed development involves the construction of a dedicated pedestrian and cycle route from the western side of the L3616-0, west of Carrigtwohill, to the south of L3617-0, east of Carrigtwohill. Dedicated pedestrian and cycle links will be provided from this route to Carrigtwohill Train Station, the planned Carrigtwohill School’s Campus (planning reference 19/5707), and along the L3617-0. The proposed development includes the following:
- a general cross section of 4m wide shared pedestrian and cycle path with public lighting and landscaping on both sides
- 2 no. pedestrian/ cyclist bridges including one over the Cork to Midleton railway line
- 1 no. railway underpass (at existing underpass structure)
- 1 no. road underpass of the L3617-0
- at grade pedestrian/ cyclist crossings of existing roads (L3616-0, L3603-0, L3606-37, L7641-0 and L3617-0)
- traffic calming measures on existing roads (L3616-0, L3603-0, L3606-37, L7641-0 and L3617-0)
Comhairliúchán seachtrach
To view the consultation click the button below.