Part 8 Castletownbere R572 Upgrade
- Foilsithe: 8 Márta 2019
- oscailte le haghaidh aighneachtaí ó: 15 Márta 2019
- Dúnadh na haighneachtaí: 29 Aibreán 2019
- An t-eolas is déanaí: 11 Aibreán 2025
Consultation is closed
Summary
The construction of shared use footpaths and cycleways, footpaths, junction improvements and traffic calming at Rodeen, Derrymihan West and Foildarrig, Castletownbere between the Bridewell junction of the R-572-312 and L-4918-0 and a point 363 metres west of the Rodeen Cross junction of the R-572-312 and L-4920-0 for a distance of 2230 metres.
Comhairliúchán seachtrach
To view the consultation click the button below.