Comhairliúchán
Part 8 Proposed R611 Cork Road Pedestrian Crossing & Active Travel Link to CETB Site
- Foilsithe: 3 Márta 2022
- oscailte le haghaidh aighneachtaí ó: 25 Feabhra 2022
- Dúnadh na haighneachtaí: 1 Aibreán 2022
- An t-eolas is déanaí: 3 Márta 2022
Consultation is closed
An overview of the proposed development includes the following elements:
- installation of approx. 70m long 3-4m wide footpath linking an existing footpath along R611 Cork road and the recently completed pedestrian/cycle path within school grounds
- alteration to the existing footpaths, alteration to the existing boundary fences, installation of the controlled gate to be operated by the School Campus management, and
- all ancillary works as required to deliver the proposed scheme
The land acquisition is necessary from private landowners.
Comhairliúchán seachtrach
To view the consultation click the button below.