English

Cuardaigh ar fad gov.ie

Comhairliúchán

Part XAB Mallow Town Park Proposed Improvement Works

  • Ó: Comhairle Chontae Chorcaí

  • Foilsithe: 27 Bealtaine 2021
  • oscailte le haghaidh aighneachtaí ó: 27 Bealtaine 2021
  • Dúnadh na haighneachtaí: 13 Iúil 2021
  • An t-eolas is déanaí: 27 Bealtaine 2021

Consultation is closed

The proposed development is to provide improvement works to the existing Town Park and comprises:

  • enhancement of existing park entrances and construction of new entrances
  • widening of existing footpaths from 2m to 3m and widened pedestrian bridge crossing of the Caherduggan/Spa Glen stream
  • construction of new footpaths
  • reconfiguration and enhancement of existing grass playing pitches and training area
  • construction of multi-use events area and jogging/ walking trail
  • construction of 5no. angling stands on the banks of the River Blackwater
  • redevelopment of existing playground, construction of skate plaza and pump track
  • construction of bike and car parking areas
  • undergrounding of existing overhead 10kV powerlines
  • park fencing/gates; signage; drainage; furniture; planting
  • all associated site development and landscaping works

Comhairliúchán seachtrach

To view the consultation click the button below.