English

Cuardaigh ar fad gov.ie

Comhairliúchán

Pedestrian and Cycle Route from Bury’s Bridge, Kilcoolishal to Carrigtwohill via Glounthaune

  • Ó: Comhairle Chontae Chorcaí

  • Foilsithe: 16 Eanáir 2020
  • oscailte le haghaidh aighneachtaí ó: 6 Nollaig 2019
  • Dúnadh na haighneachtaí: 24 Feabhra 2020
  • An t-eolas is déanaí: 11 Aibreán 2025

Consultation is closed


Summary

The Scheme involves the construction of a dedicated pedestrian and cycle route on the northern side of the L3004 (the former N25) road and includes the following:

• A general cross section of 3m wide shared pedestrian and cycle path with a 1m landscaped separation between the path and the public road where possible

• Formalised parking and controlled (i.e. traffic signals) pedestrian crossings

• New footpaths, ducting and LED public lighting

Submissions and observations with respect to the proposed development, dealing with the proper planning and sustainable development of the area in which the development would be situated, may be made online at www.yourcouncil.ie, by email to trafficandtransport@corkcoco.ie or in writing to Senior Engineer, Cork County Council, Traffic and Transportation, Floor 11, County Hall, Cork, on or before Monday 24th February 2020.

Comhairliúchán seachtrach

To view the consultation click the button below.