English

Cuardaigh ar fad gov.ie

Comhairliúchán

Ballybofey and Stranorlar Flood Mitigation – River Finn Instream Works

  • Ó: Comhairle Chontae Dhún na nGall

  • Foilsithe: 18 Samhain 2019
  • oscailte le haghaidh aighneachtaí ó: 6 Samhain 2019
  • Dúnadh na haighneachtaí: 29 Samhain 2019
  • An t-eolas is déanaí: 18 Samhain 2019

Consultation is closed


Summary

Dredging Works to the River Finn at 3 no. locations. Dredging of material for flood relief works along the River Finn in Ballybofey and Stranorlar.

Submission and observations with respect to the proposed development dealing with:

(I) The implications of the proposed development for proper planning and sustainable development in the area concerned,

(II) The likely effects on the environment of the proposed development,

(III) The likely significant effects of the proposed development on a European site, if carried out.

can be made free of charge to the board at An Bord Pleanala, 64 Marlborough Street, Dublin 1 before 4:30pm on the 29 November 2019.

Comhairliúchán seachtrach

To view the consultation click the button below.