Ballyshannon to Bundoran Active Travel Scheme
- Foilsithe: 4 Lúnasa 2023
- oscailte le haghaidh aighneachtaí ó: 4 Lúnasa 2023
- Dúnadh na haighneachtaí: 5 Meán Fómhair 2023
- An t-eolas is déanaí: 12 Aibreán 2025
Consultation is closed
Donegal County Council proposes to provide a new shared use pedestrian and cyclist facility adjacent to the existing R267 Ballyshannon to Bundoran road (Finner Road).
The project will include:
a) Provision of a shared use cycle / pedestrian facility on the northern verge of the existing R267 (Finner Road)
b) Provision of appropriate road crossings both controlled and uncontrolled
c) Provision of upgraded public street lighting within the urban scheme extents
d) Provision of all appropriate drainage, earthworks, road marking and road signage for the project
e) Minor realignment of the existing R267 Regional Road to the south to accommodate the new facility
f) All other ancillary and tie in works to TII, DMURS and National Cycle Manual standards