English

Cuardaigh ar fad gov.ie

Comhairliúchán

Collon Bridge Replacement

  • Ó: Comhairle Chontae Dhún na nGall

  • Foilsithe: 16 Eanáir 2020
  • oscailte le haghaidh aighneachtaí ó: 14 Eanáir 2020
  • Dúnadh na haighneachtaí: 27 Márta 2020
  • An t-eolas is déanaí: 11 Aibreán 2025

Consultation is closed


Summary

Donegal County Council propose to replace Collon bridge with a 1200mm diameter pipe in the townland of Glebe, Carndonagh, part of the Inishowen Municipal District as scheduled below.

The project will include:

• Removal of the existing structure and replacement with a single pipe.

• Regrading of the stream to the downstream side of the bridge.

The bridge is located 2.5 km to the west of Carndonagh town on the R238.

Any existing services will be accommodated during the bridge replacement works.

Submissions and observations with respect to the proposed development may be made in writing to The County Secretariat, Donegal County Council, County House, Lifford, County Donegal, F93 Y622 before 5.00pm on Thursday 27th March 2020.

Comhairliúchán seachtrach

To view the consultation click the button below.