English

Cuardaigh ar fad gov.ie

Comhairliúchán

Development of a Social Enterprise Centre and Linear Park/Greenway at Ballyraine & Gortlee

  • Ó: Comhairle Chontae Dhún na nGall

  • Foilsithe: 27 Bealtaine 2019
  • oscailte le haghaidh aighneachtaí ó: 17 Bealtaine 2019
  • Dúnadh na haighneachtaí: 2 Iúil 2019
  • An t-eolas is déanaí: 27 Bealtaine 2019

Consultation is closed


Summary

Donegal County Council proposes to carry out the following works;

• Construction of a new three storey multi-use Social Enterprise Centre with a total floor area of 1250m2 with external public amenity space, secured play area, parking and creation of a bus/coach drop off lay-by on the Neil T Blaney Road (R250), and all associated site development works.

• First Phase development of a Linear Park/Greenway which will begin at the intersection with the new Joe Bonnar Link Road and travel in a westerly direction for a distance of 380m before terminating at Isle lane/Sprackburn. The Linear Park/Greenway shall include a two-way cycle lane, pedestrian walkway within an urban park environment, landscaping, public lighting, street furniture etc together with a corridor reserve for a future urban transport option.

Associated ancillary works to include site drainage, connection to the public water supply and other services, landscaping, appropriate boundary treatment, development related signage, connection & discharge to the public sewerage network.

All associated ancillary site works shall be located within the townlands.

Comhairliúchán seachtrach

To view the consultation click the button below.