Drumshanbo Town Centre Regeneration Project: Part 8 Public Consultation
- Foilsithe: 6 Nollaig 2023
- oscailte le haghaidh aighneachtaí ó: 6 Nollaig 2023
- Dúnadh na haighneachtaí: 26 Eanáir 2024
- An t-eolas is déanaí: 12 Aibreán 2025
Consultation is closed
The Drumshanbo Town Centre Regeneration Project will include the following works:
1. The redevelopment of two vacant three storey buildings on Main Street to include the demolition of existing rear extensions and the erection of a linear two- storey extension to the south side linking both buildings to provide commercial use to the entire ground floor and new smart working facility to the entire first and second floors.
2. The creation of a public realm and additional parking to the rear of the renovated and extended commercial buildings on Main Street.
3. The redevelopment and partial reconstruction of two derelict outbuildings to the east of the Drumshanbo River repurposed to provide commercial use.
4. Riverside and town park improvement works to enhance the existing parklands and riverside walkway (known locally as ‘People’s Park’).
Comhairliúchán seachtrach
To view the consultation click the button below.