Collon Bridge Replacement
Ó Comhairle Chontae Dhún na nGall
Foilsithe
Oscailte le haghaidh aighneachtaí ó
Dúnadh na haighneachtaí
An t-eolas is déanaí
Teanga: Níl leagan Gaeilge den mhír seo ar fáil.
Ó Comhairle Chontae Dhún na nGall
Foilsithe
Oscailte le haghaidh aighneachtaí ó
Dúnadh na haighneachtaí
An t-eolas is déanaí
Teanga: Níl leagan Gaeilge den mhír seo ar fáil.
Tá comhairliúchán dúnta
Donegal County Council propose to replace Collon bridge with a 1200mm diameter pipe in the townland of Glebe, Carndonagh, part of the Inishowen Municipal District as scheduled below.
The project will include:
• Removal of the existing structure and replacement with a single pipe.
• Regrading of the stream to the downstream side of the bridge.
The bridge is located 2.5 km to the west of Carndonagh town on the R238.
Any existing services will be accommodated during the bridge replacement works.
Submissions and observations with respect to the proposed development may be made in writing to The County Secretariat, Donegal County Council, County House, Lifford, County Donegal, F93 Y622 before 5.00pm on Thursday 27th March 2020.
Chun an comhairliúchán a fheiceáil cliceáil ar an gcnaipe thíos.