Appointment of Consultants
Foilsithe
An t-eolas is déanaí
Teanga: Níl leagan Gaeilge den mhír seo ar fáil.
Foilsithe
An t-eolas is déanaí
Teanga: Níl leagan Gaeilge den mhír seo ar fáil.
The following is a complete set of the Department of Education Appointment of Consultants documents.
Further guidance for school authorities, and their design teams, is available on our School Building and Design page.
Document edition numbers and revisions are stated on the cover of each document. To check for previous versions scroll down to archived documents.
As a result of the recent changes made to the Pillar 2 of the CWMF website (constructionprocurement.gov.ie ) documentation relating to Standard Conditions of Engagement Documentation, Instruction to Tenderers Documentation and within Pillar 3 of the CWMF website (constructionprocurement.gov.ie ) relating to Suitability Assessment documentation for Service Providers there was a requirement for the Department of Education to update Department Specific versions of elements of the CWMF documentation to reflect the recent updates. Users should refer to both the Department of Education Website and the CWMF website to ensure the most up to date and correct information is being used as part of tender processes. Where there are queries please contact the Department for further direction at any time at PBUprocurement@education.gov.ie. Documents updated include Instruction to Tenderers documentation, Conditions of Engagement documentation where applicable, Conditions of Engagement Schedules A&B where applicable and updates to Suitability Assessment Documentation for Service Providers (Consultants). Please refer to the CWMF website in relation to the updates on the Conditions of Engagement Documentation at Amendments to the Conditions of Engagement for Fee Adjustments published - Capital Works Management Framework. And please refer to the CWMF website at the following link Updated tender templates for Consultants published - Capital Works Management Framework. in relation to the Suitability Assessment Documentation changes.
The PDSP Conditions of form of tender documents have been updated as of September 2024 – Document now updated - Form of Tender and Proposal Form for PSDP Consultant Service - September 2024
The PDSP Conditions of engagement documents referenced and updated version for March 2023 but a 2019 version of the document remained at the download link. The document has now been updated to reflect the March 2023 updated document
The Department of Education Form of Tender (And Tender Proposal Form) documents for both (Open Procedure for Minor Projects, Type 2a) had been updated in May 2024. There was an error within the fee payment structure that was updated in early May 2024 which did not reflect the structure of Type 2A projects. This error has now been updated and corrected to reflect the Type 2a projects stages
The Department of Education Form of Tender (And Tender Proposal Form) documents for both (Restricted Procedure for Major Projects, Type 2b and Type 3 and Type 4) and Open Procedure for Minor Projects, Type 2a) have been updated. The Form of Tender and Proposal Form for PSDP Consultant Services has also been up dated to include details on fee percentages where various design stages have previously been completed. The purpose of these updates is to ensure that the Form of Tender (And Proposal Form) documents align with the recent Practice Note February 2024 relating to the realignment of PSDP fees issued by The Department of Education.
The Department of Education has published the attached Practice Note in relation to the realignment of PSDP fees.
It permits PSDP Consultants to draw-down a fee payment on successful completion of Stage 1 and facilitates three equal payments during Stage 4 Construction.
The purpose of this Practice Note is to align the PSDP payment structure with the other design team disciplines appointed to Department funded school projects.
The Department of Education suite of tender documentation associated with the appointment of a PSDP has been updated. These include the Form of Tender & Proposal, COE-1 Schedules A&B, Instructions to Tender, Conditions of Engagements and Letter of invitation.
The Department of Education Minor Works (Type 2a) Form of Tender documents for Architects, Engineers and Quantity Surveyors have been updated to incorporate changes to the assessment criteria to reference green public procurement.
The Department of Education Form of Tender documents for Architects, Engineers and Quantity Surveyors has been updated to include Type 4 projects and to incorporate changes to the assessment criteria to reference green public procurement. The Marking Matrix sheet has also been updated to reflect these amendments.
The DoE Suitability Assessment Declaration form and Appendices have been updated.
Guidance on Procuring Consultants for Small Works Projects
4th Edition - October 2021
The Conditions of Engagement and associated Schedules A and B have been updated and separated to reflect recent changes to these documents published on the Capital Works Management Framework website. The relevant Letters of Invitation and Letters of Acceptance have been updated accordingly.
The Guidance for Appointing Design Teams for Devolved Grant Projects has been updated to reflect these changes.
New template document "Template Letter to PSDP to assess Design Team candidates", relating to the role of the Project Supervisor Design Process (PSDP) has been uploaded.
The Guidance for Appointing Design Teams for Devolved Grant Projects has been revised to clarify the need to have a separate RFT for each of the four consultancy disciplines (refer to section 5.4, paragraph 6.). The eTenders RFT checklist (Open Procedure) and eTenders RFT checklist for PSDP tables have also been amended to realign with recent changes to the eTenders website.
The Consultants Tender Marking Matrix has been amended to realign the reference hours for Architects, Engineers (Services and Civil & Structural) and Quantity Surveyors for Project Types 2a(0), 2a(1), 2a(2), 2b(1) and 2b(2). This realignment was considered necessary to better reflect the level of hours being tendered for consultancy services for these project types and due to the change from lump sum to percentage fees for Type 2a projects.
New guidance note for the appointment of Design Teams for Devolved Grant projects has been uploaded (see Guidance below). Fees for projects using the Open Procedure for Minor Projects, Type 2a , will now be tendered on the basis of a percentage fee which will be converted to a Lump Sum Fixed Price fee at Stage 1. Forms of Tender have been amended to reflect this change.
The DoES Tender Marking Matrix has been updated to include additional Type 3 project categories, i.e. 3(7), 3(8), 3(9) and 3(10).
New additional documents have been uploaded, including template letters to non-compliant tenderers (both Restricted and Open procedures), template letter of intent (Open procedure), template letter to unsuccessful tenderers (Open procedure) and template letter of acceptance (Open procedure)
New additional documents relating to the Appointment of Project Supervisor Design Process (PSDP) have been uploaded, including Suitability Assessment Declaration (QC1) and template letter of invitation, letter to unsuccessful tenderers, letter of intent and letter of acceptance.
Documents for appointment of consultants updated (Suitability Assessment, Award Stage Documents (Restricted Procedure) and Award Stage Documents (Open Procedure). Scroll down to view.
DoES Schedule of Stage Services for Construction Consultants (Revision 5, January 2018) published. Revision provides updated reference to Design Team Procedures Practice Note 1 (Revision 2, February 2017)
Guidance for Appointing Design Teams for Devolved Grant Projects
FSR-Annex-v1.0-04-11-2024 - To be issued if the value of the competition is €250 million or greater
DoES Form of Tender Consultants - Major (Engineers & QS) 2024
DoES Form of Tender Consultants - Major (Architect, Design Team Leader) 2024
DoES ITTS Instructions to Tenderers (Restricted for Major Projects, Type 2b and Type 3 and Type 4)
Published November 2024
DoES-COE1 - Schedules A & B (Engineers & QS) (Type 2b and Type 3 and Type 4)
Published November 2024
DoES-COE1 - Schedules A & B (Architect, Design team Leader) - (Major Projects, Type 2b and Type 3 and Type 4)
Published November 2024
Template Letter of Invitation to Tender (Restricted)
Published April 2020
Template letter to Non-Compliant Tenderers (Restricted)
Published December 2018
Template letter to Unsuccessful Tenderers (Restricted)
Published November 2018
Template Letter of Acceptance (Restricted)
Published April 2020
DoE Form of Tender Consultants - Minor (Engineers Qs) 2024
DoE Form of Tender Consultants - Minor (Architect Design Team Leader) 2024
DoES-COE1 - Schedules A & B (Architect, Design team Leader) (Minor Projects, Type 2a)
Published November 2024
DoES-COE1 - Schedules A & B (Engineers & QS) (Minor Projects, Type 2a)
Published November 2024
DOES ITTS 1b Instructions to Tenderers for Services (Restricted Procedure) (Type 2A)
Published November 2024
DoES ITTS 2b Instructions to Tenderers for Services (Open Procedure) (Type 2A)
Published November 2024
Template Letter of Invitation to Tender (Open)
Published April 2020
Template letter to Non-Compliant Tenderers (Open)
Published December 2018
Template letter to Unsuccessful Tenderers (Open)
Published December 2018
Form of Tender and Proposal Form for PSDP Consultant Service - September 2024
DOES ITTS 1b Instructions to Tenderers (Restricted) (PSDP) -
Published November 2024
DOES ITTS 2b Instructions to Tenderers (Open) (PSDP)
Published November 2024
PSDP Conditions of Engagement - COE-1-v2.j-30-09-2024
Published November 2024
DoES-COE1 - Schedules A&B DoE (PSDP)
Published November 2024
Template Letter to Unsuccessful Tenderers (PSDP)
Published October 2018
Template Letter to PSDP to assess Design Team candidates
Published September 2019
Note: For the appointment of Consultants for Small Works (summer works and devolved projects) refer to: Guidance on Procuring Consultants for Small Works Projects
Appendix B - Sample Invitation to Tender Letter
Revised October 2021
Appendix C - Sample Invitation to Tender Letter (eTenders)
Revised October 2021
Appendix G - Health - Safety Declaration
Revised October 2021
Appendix H - Template Letter to Unsuccessful candidates
Revised October 2021
Appendix I - Template Letter of Acceptance
Revised October 2021
Appendix J - Conditions of Engagement - Schedules A _ B
Published November 2024
Appendix J - Conditions of Engagement - Schedules A _ B
Revised October 2021
Standard Conditions of Engagement for Consultancy Services (Technical)- (For appointment of consultants for small works only)
Published March 2011
DoES ITTS Instructions to Tenderers (PSDP)
Updated March 2023
DoES-COE1 - Schedules A & B (Architect, Design team Leader)
Published August 2023
DoES-COE1 - Schedules A & B (Engineers & QS)
Published August 2023
DoES ITTS Instructions to Tenderers (Restricted)
Published 2023
DoES Schedule of Stage Services for Construction Consultants
Published September 2010 (Revision 5, January 2018)
DoES-COE1 - Schedules A & B (Architect, Design team Leader)
Published August 2023
DoES-COE1 - Schedules A & B (Engineers & QS)
Published May 2023
Health and Safety Compliance Declaration
Published July 2013
Personal Situation Declaration - Confirmation of validity of Declaration on Oath
Published July 2013
DoES-QC1 Suitability Assessment Declaration 2022
December 2022
DoES-COE1 - Schedules A & B (Engineers & QS)
Published August 2023
Step-by-Step Guide to using eTenders
2nd Edition, April 2016
DoES Form of Tender Consultants - Major (Architect, Design Team Leader) 2023
DoES Form of Tender Consultants - Major (Engineers & QS) 2023
DoE Form of Tender Consultants - Minor (Engineers Qs) 2022
DoE Form of Tender Consultants - Minor (Architect Design Team Leader) 2022
Template Letter of Invitation to Tender (Restricted)
Published 2018
Template Letter of Acceptance (Open)
Published November 2018
Conditions of Engagement - Architect/Design Team Leader: DoES-COE1 - including Schedules A&B (Architect, Design team Leader)
Published 2018
Conditions of Engagement - Engineers & QS: DoES-COE1 - including Schedules A&B (Engineers & QS) - 2018 PSDP Conditions of Engagement Schedules AB
Published 2018
Guidance for Appointing Design Teams for Devolved Grant Projects
Published March 2019 (Revised July 2019)
Guidance for Appointing Design Teams for Devolved Grant Projects
Published March 2019
DoES Form of Tender Consultants - Minor (Architect, Design Team Leader)
Published 2018
DoES Form of Tender Consultants - Minor (Engineers & QS)
Published 2018
DoES Form of Tender Consultants - Minor (Architect, Design Team Leader)
Published March 2015
DoES Form of Tender Consultants - Minor (Engineers & QS)
Published March 2015
Conditions of Engagement - Architect/Design Team Leader: DoES COE1- including Schedules A&B (Architect, Design team Leader)
Published August 2016
Conditions of Engagement - Engineers & QS: DoES COE1 - including Schedules A&B (Engineers & QS)
Published August 2016
DoES Tender Excel Marking Matrix - (Tender)
Published March 2015
Template Letter of Invitation to Tender (Open)
Published 2018
DoES Form of Tender Consultants - Major (Architect, Design Team Leader)
Published March 2015
DoES Form of Tender Consultants - Major (Engineers & QS)
Published March 2015
DoES ITTS Instructions to Tenderers (Restricted)
Published 2016
Conditions of Engagement - Architect/Design Team Leader: DoES COE1- including Schedules A&B (Architect, Design team Leader)
Published August 2016
Conditions of Engagement - Engineers & QS: DoES COE1 - including Schedules A&B (Engineers & QS)
Published August 2016
Template Letter of Invitation to Tender (Restricted) - (Option 1)
Published 2018
Template Letter of Invitation to Tender (Restricted) - 2018 (Option 2 - eTenders)
Published 2018
DoES Tender Excel Marking Matrix (Award Stage)
Published 2015 (Revision 1)
Template Letter of Invitation to Tender (Restricted)
Published 2016
Template Letter of Invitation to Tender (Open)
Published 2016 (Superseded)
DoES Schedule of Stage Services for Construction Consultants
Published September 2010 (Revision 4, August 2016) (Superseded)
DoES ITTS Instructions to Tenderers (Restricted)
Published 2015
DoES Schedule of Stage Services for Construction Consultants
Published September 2010, (Revision 3, Jan 2015)
Conditions of Engagement - Architect/Design Team Leader: DoES COE1 - including Schedules A&B (Architect, Design Team Leader)
Published March 2015
Conditions of Engagement - Engineers & QS: DoES COE1 - including Schedules A&B (Engineers & QS)
Published March 2015
Template Letter of Invitation to Tender (Restricted)
Published March 2015
DoES ITTS Instructions to Tenderers (Open)
Published March 2015
Template Letter of Invitation to Tender (Open)
Published March 2015
Guidance on Procuring Consultants for Small Works Projects
3rd Edition, April 2016
Guidance on Procuring Consultants for Small Works
2nd Edition, Mar 2014 (Superseded)
DoES Tender Excel Marking Matrix (Award Stage)
Published March 2015
DoES-ITTS1b Instructions to Tenderers (Restricted)
Published 2013
DoES Standard Schedule of Stage Services for Construction Consultants
Published September 2010 (Revision 2, January 2011)
COE1 - Standard Conditions of Engagement for Consultancy Services (Technical) Architect - Including Standard Schedule A and B - (Both Open Procedure and Restricted Procedure)
Published May 2011
COE1 - Standard Conditions of Engagement for Consultancy Services (Technical) QS/ Engineers - Including Standard Schedule A and B - (Both Open Procedure and Restricted Procedure)
Published May 2011
Guidance on Procuring Consultants for Small Works
1st Edition, Mar 2012 (Revision 1 Aug 2013)
DoES Guidance on Procuring Consultants for Small Works
1st Edition, Mar 2012 (Revision 1 Aug 2012)
DoES Instruction to Tenderers for Consultancy Services - Open Procedure
Published May 2011
DoES Tender Proposal Form for Consultancy Services
Published May 2011
DoES Excel Cost of Services Spreadsheet
Published May 2011 (Revision 1)
DoES Guidance Note 1.2 - Open Tendering Procedure
1st Edition, Published May 2011 (Revision 4)
DoES Consultants Pre-qualification Assessment Sheet
Published May 2011
DoES-QC1 Suitability Assessment Questionnaire DoES-QC1 (Short form )
Published May 2011
DoES Instruction to Tenderers for Consultancy Services - Restricted Procedure
Published May 2011
DoES Tender Proposal Form for Consultancy Services
Published May 2011
DoES Excel Cost of Services Spreadsheet
Published May 2011, (Revision 1)