The following is a complete set of the Department of Education Procedures and Cost Plans documents.
Further guidance for school authorities, and their design teams, is available on our School Building and Design page.
Document edition numbers and revisions are stated on the cover of each document. To check for previous versions scroll down to archived documents.
• An updated practice note for December 2024 has been developed in relation to Works Contractors SAQ documentation. This update is required as a result of the Office of Government Procurement publishing amended template documents for the procurement of Works Contractors on the 18th of November 2024. These updates relate to documents (QW1, QW2, QW3a & QW Part 2),SAQ Appendices and introduction of a new SAQ Supplemental Annex. Please refer to the following link for further detail on the changes https://constructionprocurement.gov.ie/tender-template-for-works/#more-10837 . The exact changes made to the SAQ documents can be found at the following link https://constructionprocurement.gov.ie/wp-content/uploads/Change-Note-QW-18-11-2024.pdf . In addition to the above updates criteria 3.4a,3.4b,3.4c and 3.4d are now evidence required criteria for both open and restricted tender procedures.
• An additional Change Order Request Form has been developed for projects with Contract Versions PWCF1 – PWCF5 which is now available for use on applicable projects. The template will ensure information in relation to Change Order Requests is being collated and provided in a clear, concise, accurate and consistent manner as part of the funding approval process for relevant Contract changes.
Further the recent practice note in relation to SAQ’s in July 2024 a further update has been provided in relation to a number of additional issues which required clarification. Some of the previously archived Department of Education templates have been reintroduced for use as they relate specifically to the Department of Education’s qualitative criteria marking scheme in relation to criteria 3.4c for both main contractors and reserved specialist. The current CWMF suite of documentation and in particular the B2 certificates do not align with the current Department of Education marking scheme requirements. Templates have been provided for both the Main Contractors and Reserved Specialist SAQ processes. The CV templates have also been reintroduced for both Main Contractors and Reserved Specialists as the CWMF suite of documents does not have an applicable CV template.
Further the recent advice note in relation to SAQ’s in June 2024 a further update has been provided in relation to a number of additional issues. An additional note has been added for criteria 3.3a turnover and 3.4c experience for both the open and restricted procedures. Criteria information in section 3.3d (financial statements) have been updated to reflect the current Contracting Authority requirements. Users requiring access to SAQ templates should use the documents listed under Pillar 3 of the CWMF website (constructionprocurement.gov.ie). The guidance note now published ref DTP Practice Note – SAQ documentation – July2024 within the Contract Notices & Contractor Suitability Assessment Questionnaires section of the website provides guidance on the current Contracting Authority specific information which is required to be included as part of the content of the open and restricted procedure Works Contractors SAQ’s.
The office of Government Procurement (OPGP) have carried out extensive updates to the Construction Works Management Framework (CWMF) Suitability Assessment Questionnaires for Works Contractors.
The Department of Education’s previous versions of SAQ have been removed. Users requiring access to SAQ templates should use the documents listed under Pillar 3 of the CWMF website ( constructionprocurement.gov.ie )
Updated Completion Certificate for Stage 2b published.
Design Team Procedures Practice Note 3, “Inclusions in Tender Documents in Relation to Covid-19 for Projects Proceeding to Tender”, has been added. Scroll down to view.
Minor amendments to QW1 Appendix L CV Template and QW4 Appendix L CV Template (Reserved Specialists)
Procurement Documents for pre-qualification of Reserved Specialists have been added.
DTP Practice Note 1 - Changes to Public Works Contracts 2016
Revision 3, June 2018
DTP Practice Note 2 - Changes to Public Works Contracts 2018
Published June 2018
DTP Practice Note 3 - Inclusions in Tender Documents in Relation to Covid-19 for Projects Proceeding to Tender
Published August 2020
DTP-2012 - Pay and Conditions of Employment
1st Edition, March 2012 (Revision 1, May 2012)
DTP-2012 - Preliminary Design - Stage 1
1st Edition, March 2012
DTP-2012 - Developed Design - Stage 2a
1st Edition, March 2012
DTP-2012 - Detailed Design - Stage 2b
1st Edition, March 2012
DPT 2012 Preparation of Tender documents
1st Edition, March 2012 (Revision June 2013)
DPT 2012 Procuring Construction Contractors
1st Edition, March 2012 (Revision 3 April 2019)
TGD-007 - Design Team Procedures for Small Works
6th Edition, September 2018
TGD-007 - Appendix D - Template Letter of Intent
7th Edition, 2021
TGD-007 - Appendix E - Template Letter to Unsuccessful Tenderers (for use with Public Works Short Form of Contract)
7th Edition, 2021
TGD-007 - Template Letter of Acceptance (for use with Public Works Short Form of Contract)
Published December 2018
DoES Contractor Suitability Declaration for Small Works
Published April 2011
OPW Code of Practice for Management of Asbestos Materials in Schools
Published April 2010
OPW Pre-refurbishment Demolition Asbestos Survey Request Form
Published April 2010
DTP-2012 Completion Certificate - Stage 1
Published April 2012
DTP-2012 Completion Certificate - Stage 2a
Published April 2012
DTP-2012 Completion Certificate - Stage 2b
Updated June 2021
DTP-2012 Completion Certificate - Stage 3
Published April 2012
DTP-2012 Completion Certificate - Stage 4
Published April 2012
DTP-2012 Completion Certificate - Stage 5
Published April 2012
See DPT 2012 Procuring Construction Contractors (Revision April 2019) ].
DTP Practice Note - SAQ Documentation - Final December 2024
Guidance on Turnover Thresholds for School Projects
First published October 2013
DTP-2012 - De-briefing letter - Applicants
Published April 2019
Appendix B2 Certificate of Satisfactory Execution – Main Contractors
Revised October 2024
Appendix M - Marking Scheme Explanatory Notes (Main Contractors)
Revised October 2024
QW1 Appendix L CV Template (Main Contractors)
Revised October 2024
Appendix B2: Certificate of Satisfactory Execution - Works Only (Reserved Specialists)
Revised October 2024
Appendix M - Marking Scheme Explanatory Notes (Reserved Specialists)
Revised October 2024
Change Order Request Form 2024 - Contract Versions PWCF1 to PWCF 5
Ciorclán Uimhir: 0034/2022
Teorainneacha Costais do Fhoirgnimh Iar-Bhunscoile
Outline Cost Plan Template
1st Edition, Published August 2011
Detailed Cost Plan/ Tender Analysis Template
1st Edition, Published August 2011
DTP Practice Note – SAQ Documentation — October 2024
DTP Practice Note – SAQ Documentation — July 2024
Appendix M Marking Scheme Explanatory Notes
Published April 2019
DTP Practice Note – SAQ documentation – June 2024
0028/2021
Cost Limits for Post-primary School Buildings
0027/2022
Scéim Deontais don Bhonneagar ICT – Scoilbhliain 2021/2022
0081/2018 - Cost Limits for Primary School Buildings
Published December 2018
0082/2018 - Cost Limits for Post-Primary School Buildings
Published December 2018
DoES QW4 Suitability Assessment Questionnaire Restricted - Reserved Specialists
Revised July 2018
DPT 2012 Procuring Construction Contractors
1st Edition, March 2012 (Revision July 2018)
DoES QW1 Suitability Assessment Questionnaire Restricted (For use with PWC - CF1 with Reserved Specialists)
Revised July 2018
DoES QW1 Suitability Assessment Questionnaire Restricted (For use with PWC - CF5 and CF1 where Reserved Specialists are not used)
Revised July 2018
DoES - QW2 Suitability Assessment Questionnaire Open
Revised July 2018
Form B2 Certificate of Satisfactory Execution
Published July 2018
DTP-2012 - De-briefing letter - Applicants
Published April 2012
0043/2017 - Cost Limits for Primary School Buildings
Published June 2017
0044/2017 - Cost Limits for Post-primary School Buildings
Published June 2017
TGD-007 - Design Team Procedures for Small Works
5th Edition, April 2016 (Superseded)
Template Contract Notice OPEN (below EU threshold)
Published October 2013
Template Contract Notice RESTRICTED (below EU threshold)
Revised August 2015
Template EU Contract Notice RESTRICTED
Published October 2013
DoES QW4 Suitability Assessment Questionnaire Restricted - Reserved Specialists
Published September 2016
DoES - QW2 Suitability Assessment Questionnaire Open
Revised July 2017
DoES QW1 Suitability Assessment Questionnaire Restricted (For use with PWC - CF5 and CF1 where Reserved Specialists are not used)
Revised July 2017
DoES QW1 Suitability Assessment Questionnaire Restricted (For use with PWC - CF1 with Reserved Specialists)
Revised July 2017
DPT 2012 Procuring Construction Contractors
1st Edition, March 2012 (Revision June 2013)
DTP Practice Note 1
February 2017 (Revision 2)
0010/2016 - Cost Limits for Primary School Buildings
Published February 2016
0011/2016 - Cost Limits for Post Primary School Buildings
Published February 2016
DoES-QW1 Suitability Assessment Questionnaire Restricted
2013 (Revision March 2014)
DoES - QW2 Suitability Assessment Questionnaire Open
2013 (Revision March 2014)
0040/2015 - Cost Limits for Post Primary School Buildings
Published June 2015
0039/2015 - Cost Limits for Primary School Buildings
Published June 2015
0028/2014 - Cost Limits for Post Primary School Buildings
Published April 2014
TGD-007 - Design Team Procedures for Small Works (4th Edition, March 2014)
Revised
0027/2014 - Cost Limits for Primary School Buildings
Published April 2014
TGD-007 - Design Team Procedures for Small Works
3rd Edition, March 2011
0075/2010 - Cost Limits for Post-primary School Buildings
Published December 2010
0074/2010 - Cost Limits for Primary School Buildings
Published December 2010
DoES-QW1 Suitability Assessment Questionnaire Restricted
Published April 2012 (Revision June 2013)
DoES - QW2 Suitability Assessment Questionnaire Open
Published April 2012 (Revision June 2013)
Template eTender Invitation to Tender RESTRICTED (below EU threshold)
Published April 2012
Template eTender Invitation to Tender OPEN (below threshold)
Published April 2012
DoES - QW2 Declaration of Suitability (Open)
Published April 2012
DoES-QW1 Suitability Assessment Questionnaire (Restricted)
Published April 2012
DTP-2012 - Preparation Tender Documents
1st Edition, March 2012
DTP-2012 - Procuring Construction Contractors
1st Edition, March 2012
DTP-2012 - Pay and Conditions of Employment
1st Edition, March 2012
Design Team Procedures
3rd Edition, August 2007 (Revision 1, February 2008)
DTP Practice Note 1 - New GCCC Forms of Construction Contracts for Public Works Transition Arrangements
Published September 2008
DTP Practice Note 2 - Guidance on the Preparation of Tender Documents
1st Edition, November 2009
DTP Practice Note 3 - Revised Stage 2b Design Team Procedures
1st Edition Nov 2009
DTP Practice Note 5 - Pay and Conditions of Employment
1st Edition, October 2010
DTP Practice Note 6 - Electronic Issue of Tender Documents
1st Edition, March 2011
DTP Practice Note 7 - Open Tendering for Construction Projects
Published May 2011
TGD-008 - Engaging Professional Consultants for Small Works
3rd Edition, March 2011
Stage 1 Completion Certificate
2007
Stage 2a Completion Certificate
2007
TGD-007 - Design Team Procedures, Protocol for Devolved Grants
2nd Edition, March 2009
TGD-008 - Engaging Professional Consultants for Devolved Grants Projects
2nd Edition, March 2009 (Revision 2, 29th April 2009)
TDG-008a - Standard Conditions of Engagement for Consultancy Services (Technical) Schedules for Devolved Grants
0070/2009 - Cost Limits for Post-Primary Schools Buildings
Published November 2009
0069/2009 - Cost Limits for Primary Schools Buildings
Published November 2009
TGD-007 - Technical Guidance
2nd Edition, March 2009 (Revision 3) (Superseded)
0071/2006 - Cost Limits for Primary School Buildings
Published June 2006 (Superseded)
0072/2006 - Cost Limits for Post-Primary School Buildings
Published June 2006 (Superseded)
Design Team Procedures
2nd Edition, August 1983 (Superseded)
Briefing note on use of Specialist Contractors in School Projects