Bailiúcháin
Review of the South Galway Flood Study Report
- Foilsithe: 14 Eanáir 2019
- An t-eolas is déanaí: 16 Eanáir 2020
Review of the South Galway Flood Study Report:
Assessment of the Existing Ballinderreen / Kilternan Flood Relief Scheme
Amharc
amharc
Kilternan / Ballinderreen - Book of Final Drawings
Amharc
amharc
Review of the Mannin Cross, Kilchreest and Termon Flood Alleviation Schemes
Amharc
amharc
Mannin Cross, Kilchreest and Termon - Final Drawings
Amharc
amharc
Engineering Proposals for the Reinstatement of Culverts on the N18 and the Provision of New Culverts on Minor Roads at Kiltartan / Feasibility of an Overland Channel from Coole to Kinvarra:
Final Report Part 1
Amharc
amharc
Final Report Part 2
Amharc
amharc
Appendix A: Drawings
Amharc
amharc
Appendices B - D
Amharc
amharc