Belmullet Sewerage Scheme
- Foilsithe: 16 Feabhra 2018
- An t-eolas is déanaí: 27 Iúil 2018

Provide new wastewater infrastructure to comply with EU Directives and eliminate the current untreated discharge which will assist in maintaining Belmullet as a leading tourism area and provide the capacity for future population and economic growth.
See Project Ireland 2040 (PDF, from page 86) for the full detail.