Foilsiú
Vartry Water Supply Scheme
- Foilsithe: 16 Feabhra 2018
- An t-eolas is déanaí: 27 Iúil 2018

This €150 million investment is designed to ensure a safe and sustainable water supply for the north Wicklow and south Dublin area, and includes the upgrading of the existing treatment plant.
See Project Ireland 2040 (PDF, from page 85) for the full detail.